Home

Zielzustandsvorgabe

Zielzustandsvorgabe is a term used in systems engineering, project management, and organizational development to denote the specification of the desired final state of a system, process, or project. It describes how the target condition should look and function once changes are completed, and it bounds the requirements, constraints, and quality criteria that must be satisfied to reach that state.

Purpose and use

The Zielzustandsvorgabe serves as a guiding reference for design, implementation, validation, and acceptance. It provides a

Content and typical elements

A Zielzustandsvorgabe typically includes functional requirements, performance targets, architectural constraints, interfaces and data exchanges, quality attributes

Relation to other concepts

The Zielzustandsvorgabe is closely related to the Istzustand (current state) and Sollzustand (target or desired state)

Applications

Its use spans IT system modernization, process optimization, product development, and organizational change initiatives. By defining

Artifacts

Common outputs include requirement documents, target state architectures, state transition plans, and acceptance test plans that

basis
for
decision
making,
prioritization,
and
trade-offs,
and
it
supports
requirement
engineering
by
translating
stakeholder
needs
into
a
concrete
end
state
that
can
be
tested
and
verified.
(such
as
reliability,
security,
and
usability),
compliance
and
governance
rules,
migration
or
transition
needs,
resource
assumptions,
and
a
schedule
with
milestones.
It
may
also
specify
verification
and
acceptance
criteria,
as
well
as
risk
and
dependency
considerations.
concepts.
It
often
functions
as
a
more
detailed
or
formalized
input
than
a
generic
Zielbild
or
vision,
translating
it
into
concrete
criteria
for
design
and
validation.
clear
end-state
criteria,
teams
can
plan
gaps,
design
solutions,
and
measure
progress
toward
the
intended
outcome.
reference
the
Zielzustandsvorgabe.