Rüstaufwand
Rüstaufwand refers to the time and resources required to prepare a machine or production line for a new manufacturing run. This preparation, often called setup or changeover, involves activities such as cleaning the equipment, adjusting settings, loading materials, and performing initial test runs. The goal is to minimize Rüstaufwand to reduce downtime and increase overall production efficiency. High Rüstaufwand can lead to longer lead times, increased work-in-progress inventory, and higher production costs, especially for products with small batch sizes.
Several strategies are employed to reduce Rüstaufwand. One common approach is Single-Minute Exchange of Die (SMED),
The impact of Rüstaufwand is particularly significant in industries with high product variety or frequent product