Precommissioning
Precommissioning is a phase in the project lifecycle of industrial facilities during which installed systems are prepared and verified for commissioning and eventual start-up. It follows construction and mechanical completion and precedes performance testing and operation. The aim is to ensure that equipment, systems, and components are installed in accordance with design, properly integrated, and ready for safe, reliable function.
Typical activities include verifying documentation and drawings, finalizing tagging and isolation schemes, cleaning and flushing pipelines,
Documentation and deliverables include a precommissioning dossier, punch lists, as-built drawings, equipment manuals, and certificates confirming
Precommissioning differs from commissioning, which focuses on testing performance against design criteria, and from start-up, which