Kuivaaika
Kuivaaika, or drying time, is the period required for a material that has been wet or moist to reach a defined level of dryness. The term is used across various fields, including paints and coatings, wood finishing, construction materials, adhesives, and food processing, to indicate when a product can be handled, recoated, or subjected to further processing.
In paints and coatings, kuivaaika typically refers to the time until the surface is dry to the
In construction materials, such as cement and plaster, kuivaaika is related to the time until the material
Common factors that affect kuivaaika include ambient temperature, humidity, air movement, substrate moisture, and the chemistry