huippukuormia
Huippukuormia is a Finnish term used in technical and planning contexts to refer to peak loads—the highest demand a system experiences in a given period. It is a key metric in electrical engineering, telecommunications, and operations planning, used to assess capacity needs and reliability.
In electrical grids, huippukuormia describes the maximum instantaneous or periodic power demand, typically measured in kilowatts
Measurement and analysis: Peak loads are estimated from historical data, weather, calendar effects, and growth trends.
Mitigation and planning: Managing huippukuormia involves peak shaving, demand response programs, energy storage, and load balancing.