Sollzeiten
Sollzeiten, often translated as target times or standard times, denote the time allocated or deemed necessary to complete a task or process under normal working conditions. They serve as benchmarks for planning, costing and performance measurement. Sollzeiten are typically contrasted with Istzeiten, the actual times observed during execution.
Determination and calculation: Sollzeiten can be established by time studies, predefined time standards, or from historical
Applications: In manufacturing and service sectors, Sollzeiten support production planning, capacity calculation, and wage systems. They
Limitations: Sollzeiten depend on assumed conditions such as equipment, layout, and skill level. They must be
Related terms and concepts include Istzeiten (actual times), time studies, and standard-setting methods such as REFA