isimma
Isimba Falls is a hydroelectric dam built in Uganda on the overflowing water of Lake Kyoga which is then diverted and channeled down through the Simba valley to power the Isimba Dam. The dam is part of the long-term plan to generate power needed in Uganda and beyond.
The Isimba Dam is located on the course of the River Kafu which feeds into Lake Kyoga
Construction of the Isimba Falls started in 2016 and was completed in 2019 at a total cost
Isimba Falls hydroelectric project is greatly leveraging on water from Lake Kyoga that flows during the rainy