ananyagigénytervezés
Ananyagigénytervezés, often translated as material requirements planning (MRP), is a production planning and inventory control system used by manufacturers. It is designed to ensure that materials are available when they are needed in the production process, while also minimizing the amount of inventory held. The system typically uses a master production schedule, a bill of materials, and an inventory record file to calculate the quantity and timing of materials required.
The master production schedule specifies the end products to be produced and when they are needed. The
The primary benefits of ananyagigénytervezés include reduced inventory costs, improved production scheduling, and increased responsiveness to