MRPbased
MRPbased refers to the use of material requirements planning (MRP) logic within manufacturing planning and control systems to determine material needs, quantities, and timing necessary to support a master production schedule. It is focused on coordinating inventory and production to meet demand while minimizing stock levels and production delays.
Key inputs for an MRPbased system include the master production schedule (MPS), which specifies what needs to
Origins of MRP trace to the 1960s, with early development led by Joseph Orlicky and adoption by
Benefits of an MRPbased approach include improved material control, reduced inventory, better schedule adherence, and more